Stuguflåt Bridge

Stuguflåt Bridge (Norwegian: Stuguflåtbrua or Stuguflåten bru) is a stone railway bridge north of Stuguflåten on the Rauma Line over the river Rauma in Oppland. The bridge is 54.1 meters (177 ft) long, has a 30-meter (98 ft) span and is 10.6 meters (35 ft) wide.

Work began on the bridge in 1919 and the foundations were laid in autumn 1920, with the walls started by summer 1921. The first rails were laid on 16 September 1921 and were finished on 22 August 1922. The first train crossed in autumn 1922 and materials from this cargo were used to make a permanent snowplough. Stuguflåt Bridge was used year round since 1923 and the total cost of the bridge was NOK 407,997.

See also

External links